§228. Erosion and Sediment Control Requirements.
This section is included in your selections.
1. Any earth disturbance must be conducted in conformance with Chapter 102.
2. Additional erosion and sediment control design standards and criteria that must be or are recommended to be applied where infiltration BMPs are proposed shall include the following:
A. Areas proposed for infiltration BMPs shall be protected from sedimentation and compaction during the construction phase to maintain maximum infiltration capacity.
B. Infiltration BMPs shall not be constructed nor receive runoff until the entire contributory drainage area to the infiltration BMP has achieved final stabilization. (Ord. 181, 10/11/2006, §308)