Skip to main content
Loading…
This appendix is included in your selections.

Your are hereby notified that you must comply with the following water conservation performance standards for plumbing fixtures and fittings as mandated by the Delaware River Basin Commission and set forth in Ordinance No. 122.

Water Closets and Associated Flushing Mechanisms. The water consumption of water closets shall not exceed an average of one point six (1.6) gallons per flush cycle over a range of test pressures from twenty (20) to eighty (80) psi. The fixture shall perform in accordance' with the test requirements of ANSI A112.19.2M and ANSI A112.19.6M.

Urinals and Associated Flushing Mechanisms. Urinal water consumption shall not exceed an average of one point five (1.5) gallons per flush cycle over a range of test pressures from twenty (20) to eighty (80) psi. The fixtures shall perform in accordance with the test requirements of ANSI A112.19.2M and ANSI A112.19.6M

Showerheads. Showerhead discharge rates shall not exceed three (3) gallons of water per minute over a range of test pressures from twenty (20) to eighty (80) psi. The fixture shall perform in accordance with the test requirements of ANSI A112.18.1M.

Faucets. Sink and lavatory faucet discharge rates shall not exceed three (3) gallons of water per minute over a range of test pressures from twenty (20) to eighty (80) psi. The fixture shall perform in accordance with the test requirements of ANSI A112.18.1M.

Special Purpose Equipment. The above performance standards shall not apply to fixtures and fittings such as emergency showers, aspirator faucets and blowout fixtures that, in order to perform a specialized function, cannot meet the specified standards.

Exemptions. Any person(s) may apply to the Supervisors of the Township of Smithfield for an exemption to the terms of this Part, which may be granted by the Supervisors upon proof that some other device, system or procedure will save as much or more water as those set forth herein, or that those set forth herein cannot be complied with, without undue hardship.

Receipt of this Notice is hereby acknowledge this __________ day of __________, 19___

___________________________

Applicant for a Building Permit